Full-scale site prep for construction. Grading, leveling, drainage installation, and compaction to engineer specifications.

What This Involves

Site preparation is where a set of drawings becomes buildable ground. Cut and fill balanced so you are not paying to import or export material you did not need to move. Pads graded to the elevation the engineer specified, not approximately. Drainage installed before the pad is built rather than retrofitted after the first storm shows you where water actually goes. Subgrade compacted and tested so the slab poured on top of it does not crack.

We work to plan and to spec, and we document as we go. On commercial jobs that means compaction testing at the intervals your engineer requires, elevations verified against benchmark, and photographic records of what went into the ground before it was covered. General contractors and inspectors get the paperwork they need without having to chase it, which is usually the difference between a smooth inspection and a delayed one.

How We Work

  1. 1

    Review plans and stake

    We work from your civil drawings, confirm benchmarks, and stake pad corners, elevations, and drainage runs before moving material.

  2. 2

    Strip and stockpile topsoil

    Topsoil is stripped and stockpiled separately for reuse in final landscaping instead of being buried in the fill.

  3. 3

    Cut and fill

    Earthwork balanced on site wherever the plan allows, because importing or exporting material is usually the single largest avoidable cost.

  4. 4

    Install drainage

    Culverts, French drains, swales, and storm structures go in before the pad is finished, not after the water finds its own path.

  5. 5

    Compact and test

    Lifts compacted to the specified density, with third-party testing at the intervals the engineer calls for.

  6. 6

    Final grade and document

    Finish grade shot and verified against plan, with as-built elevations and photo records handed over.

Questions

Site Preparation FAQ

Straight answers to what people actually ask. If yours isn't here, call and ask.

Ask Us Directly

A residential home site typically runs 3–7 days. A one to three acre commercial pad with drainage generally runs 2–4 weeks. Weather is the dominant variable in West Virginia — saturated clay simply cannot be compacted to spec, and pushing through wet conditions produces subgrade that fails testing and has to be redone.